Welcome
We have put together this website, to give you information on the proposed Mynydd Windfarm. The proposed site is located approximately five kilometres south west of Corwen and includes land to the south east of the A494 directly to the south of the existing three Braich Ddu wind turbines and including the area of mountain named Mynydd Mynyllod.
Please take some time to read about the proposals and give us your feedback. We hope you enjoy your visit.
Key Facts
Generation capacity: Up to 75 MegaWatts (MW)
Proposed Number of turbines: Approximately 25
Size of turbines: Up to a maximum of 145 metres to blade tip.
Type of turbines: To be decided.
Generating life: 25 years



